Web Fixes
Descriptions of the web fixes for this release.
Description | Issue ID |
---|---|
Process forms associated with deleted process tasks do not link to active process tasks. | 98537 |
Document hyperlinks are not clickable when attached to a table row. | 108151 |
Revising a task type and changing its workflow template before making it available does not update the task types workflow on all projects. | 109616 |
When exporting a Tasks Report to CSV, results will differ from the filtered values if any dates are used and local timezone differs from UTC. | 109704 |
Process signoff sheet reports often time out and fail to generate properly. | 110206 |
The business unit logo is monochrome and cropped when generating a process report but appears correctly on forms. | 110527 |
If Other Answer is selected for a predefined answer question and the answer is longer than 100 characters, the form report creates an error. | 111212 |
The data displayed in the Form Detail status widget changes if the user switches projects from the top-right menu. | 111216 |
Multi-select predefined answers are displayed without any spaces in the PDF report tables. | 111266 |
When a child form is raised via a parent form, the location is not set to that of the parent. | 111341 |
Bulk downloads are not delivered if a project name contains special characters. | 111358 |
Windows reserved names are not enforced in the geometry upload causing bulk downloads to fail. | 111393 |
When viewing a process in process setup, certain fields take a long time to populate but give the impression that changes have been made when they have not. | 111394 |
Required questions haven’t been answered message appears on forms when View Required Questions shows all questions answered. | 111396 |
The static table in analysis isn’t showing the table row name. | 111424 |
Portions of a form do not display properly on form templates where a nested group is immediately followed by a page break. | 111454 |
Form distribution emails appear as sent in Communication History, but are not actually sent if the subject line contains special characters from the template or project name. | 111501 |
The Sort Workflow Template Statuses window does not have a scroll bar. | 111515 |
The name of the business process template can’t be renamed if the project is renamed. | 111554 |
Disable logical groups does not work if the question the group is linked to has not been answered. | 111648 |
Disable logical groups still appear in a form PDF if the logical question they are linked to belongs in a group. | 111667 |
The polygon tool intermittently registers double clicks when calibrating a location if multiple points are placed near to each other in quick succession. | 111729 |
Table headers are coloured blue in form PDFs when the table belongs to a disabled group | 111756 |
Including the form template names in a bulk download causes an error with the table of contents links. | 111771 |
Applying a Status Change Date filter when trying to produce a Tasks or Forms Report will produce an error message if a To Date is selected. | 111808 |
Deactivating predefined answers removes them from the form answer on web but not the PDF report. | 111821 |
The Issued To Organisation field does not auto-populate in New Web after selecting a package for a new process task | 111849 |
Moving a drawing by clicking and dragging when calibrating using the Polygon tool will result in extra points being placed. | 111882 |
The Issued To Organisation field for process tasks will be blank in New Web if the process task has an invalid package and organisation combination. | 111906 |
Locations With Most Tasks dashboard widget does not provide a full list of filters for external users. | 111944 |
Form Detail Grid widget displays legacy usernames and SSO GUIDs instead of the name of the user. | 111948 |
Custom variable template import and export generates an Oops error. | 111973 |
Distribution lists and form reports show user's original organization rather than their project organization. | 112040 |
There is a significant difference in the implementation of the status All Complete filter. In the Task grid, this filter excludes Closed statuses. However, in the Tasks Report, Closed statuses are included. This causes task reports to timeout for no apparent reason. | 112053 |
If you have a subprocess with no child tasks, it will show up on the report as an empty row. | 112137 |
A signature question in a group controlled by question logic makes the signature mandatory, and the signature does not appear until you refresh the web page. | 112138 |
The wrong organisation is being displayed when looking at the document upload page on a form via the web. | 112139 |
Importing Percentage Complete process data causes unexpected status changes. | 112190 |
When using Chrome for Mac OS, the context menu doesn't appear on the Business Structure page in Classic Field View. | 112317 |
New Task Comments Issued By and To Organisation option within the communication plan does not work. | 112354 |
There's a GetProjectFormTasksList API date range bug. | 112414 |
Previous form template versions are now being automatically expired as soon as a newer version is assigned to a single project rather than all current projects. | 112495 |
Resending old emails via the Communication History page breaks distribution and notifications. | 112518 |
Task reports don't always show images. | 112616 |