What's New in B2W Estimate 14.2
B2W Estimate 14.2 introduces features that enable you to precisely estimate how worker's compensation rates and costs will affect your bids. This release also includes enhancements to the Global Edits and Add Components dialog boxes and to the Item Listing tab and the Estimate Check Wizard.
New Features and Enhancements
-
Permanent vs. Temporary Materials
- You can flag materials as temporary in the Resources area, the Estimate Detail tab, the Global Edits - Materials tab, and in the Materials area of the RFQ Group Information tab.
- The Material Summary by Permanence report lists the materials in your estimate sorted by whether they are permanent or temporary.
-
Market Analysis (Enterprise only)
- A new category, Competitors, has been added to the Resources area.
- The Market Analysis area displays the Bid Listing and Bid Results Details tabs. You select estimates in the Bid Listing tab; B2W Estimate creates bid results and links them to the results of selected competitors. You can compare bids side-by-side in the Bid Results Details tab.
- You can import your competitors' bid information into the Bid Results tab from a spreadsheet.
- Auto-Update: Allows you to automatically update to the latest B2W Estimate version on the server without additional input.
- Send to Track: There is now a Send to Track button on the B2W Estimate toolbar so you can export estimate details to B2W Track with one select.
-
Takeoff Enhancements
- A variety of enhancements have been added to make it easier for you to work with Takeoff Estimates. Actual Bid Price, Target Bid Price and Difference are listed on the Item Pricing tab.
- The Bid Difference can be displayed on the Status Bar.
- Takeoff – Bid Qty Diff and Total Direct TKO Cost – Total Direct Bid Cost can be added as columns.
- Takeoff – Bid Qty Diff is available as a selection when setting up Conditional Formatting.
- Bid Qty is now listed in the Estimate Detail tab and Total Bid Price is now listed on the Summary Tab in TKO Estimates.
-
Labor Enhancements
- When adding labor components to an estimate, you can hide those that have Zero Base Cost in the selected labor rate class.
- You can now change the labor rate class for a labor type in Global Edits.
- You can now change labor rate clase for Labor Components, one at a time, on the Item Listing tab.
- You can now update the values for all Labor Burdens with the same description with a single change in Global Edits.
- There is a new Estimate Check Wizard to warn about burdens with zero value.
- Copy/Paste WBS Levels: You can duplicate a WBS level within an estimate. The system will automatically generate a unique code and description for the duplicate.
- Workers Compensation: (Enterprise only) You can now store specific values for work regions and workers compensation codes for items and tasks. B2W Estimate will use that information to calculate burden dollars for your labor components.