New features and enhancements in B2W Estimate 15.2
Custom Properties in estimates
The new custom properties feature allows you to gather specific information for an estimate, such as: email addresses and phone numbers of key contacts; checklists for tracking completion of tasks; projected costs; and so on. You define your own custom properties and add them to a form (referred to as a template), which you can configure however you choose.
More about custom properties
In the Estimate Information tab, select Custom as the value for Show above the information section.

Set apportioning at any WBS level (Enterprise only)
This enhancement allows you to set an apportioning scheme at any level in a Work Breakdown Structure.
More about apportioning WBS levels
- On the Estimate Detail Tab, you can apportion any level in a Work Breakdown Structure.
- A child WBS level will inherit apportioning from a parent level.

Import Bid Schedules (Enterprise only)
You can now import multiple bid schedules from an Excel file rather than entering them by hand.
More about importing bid schedules
On any Bid Schedule tab in the Market Analysis area, select Import Bid Schedules from the Tools menu. This launches the Import Bid Schedules Wizard.

To learn more, see the Import Bid Schedules Wizard help topic.
Import weights and dimensions
You can now specify the weight and volume values for your materials and equipment when importing those resources in the Import Resources Wizard.
More about importing weights and dimensions
When you import equipment or materials, you can map data from your import file to weight and volume values.

Copy/Paste components in an estimate
On the Estimate Detail tab, you can now use CTRL-C and CTRL-V or options on the right-select context menu to copy and paste cost components to new locations.
Exclude labor/equipment with zero cost when adding components in Resources
When using the Add Components dialog to add labor or equipment to a Crew Template or Task Template in Resources, and when creating or updating Pay Items or Indirect Items in Item/WBS Databases. you can filter out components with zero cost in a selected rate class.
More about excluding components with zero cost
Filtering to exclude components with zero cost is available only when adding equipment or labor to Crew Templates in the Resources area.

Remember user settings in the Add Components dialog
Sorting and filtering selections you make in the Add Components dialog in an estimate are now saved on a per-user basis.
More about saving category selections in the Add Components dialog
The Add Components dialog saves your filter and sort selections. Whether you close and reopen the dialog, open a different estimate, or exit and restart B2W Estimate, the dialog saves your selections.
- Sorting by column is saved.
- Resizing of the dialog and respacing the columns are saved.
- Show work type and Show category filter selections are saved.

SQL Server Cluster installation enhancements
The Installer and Update for B2W Estimate now handles SQL Server Clusters more gracefully to allow for easy installation and version updates.
New units of measure
New units of measure have been added to B2W Estimate.
New UM (Unit of Measure) list
| Abbreviation | Description | Measurement |
|---|---|---|
| BOTTLE | Bottle | each |
| CMI | Circuit Mile | 1 mile |
| TE | Metric Ton | Same as other Metric Ton UMs (MT & TONN) |
| PDA | Predetermined Amount | — |
| TOTE | — | 275 gallons |
| TREE | Tree | each |
| Vcm | Vertical Centimeter | Centimeter |
| Vmm | Vertical Millimeter | Millimeter |
| WIN | Welding Inch | — |