What's New in B2W Estimate 2011

Modified: 24 Sep 2026 B2W Estimate

What's New in B2W Estimate 2011

General New Features

Here are the new features and enhancements you will find in B2W Estimate 2011:

FeatureDescription
Ability to Move, Delete, or Rename Folders Within Archive DatabasesB2W Estimate's archive estimates feature has been enhanced to allow you to edit estimate folders within your archive database. This helps to ensure your estimate archive remains as clean and well organized as possible.
Ability to Create New Item Templates from Add Items DialogB2W Estimate now allows you to initiate the process of creating a new item template from within the Add Items dialog, giving you a more streamlined means of creating new item templates when a suitable one doesn't already exist.
New Search Box in Add Items DialogA new search box has been added to the Add Items dialog to help you quickly locate the items you want to add to your estimate.
New Search Box in Item History DialogEnterprise users now have the ability to specify the criteria B2W Estimate uses when locating matching items for the View Item History.
New Estimate Check Wizard Checks

The following new estimate check wizard checks have been added:

  • Quick items or tasks have categories with zero unit costs
  • Items have blank task job cost ID
  • Items or tasks have blank job cost ID
  • Equipment has zero fuel cost
  • Number of trucks is fractional
  • Material has zero tax percent
  • Selected subcontractor is not the lowest bidder
  • Selected vendor is not the lowest bidder
  • Items have zero total markup (suppressed items excluded)
  • Subcontractors have zero or negative markup
Ability to Expand Cost Structure Within Estimate Detail Tab "Grid"When viewing a detailed or comparison item or task on the Estimate Detail tab, you now have the ability to simultaneously view multiple levels of cost structure within the item or task.
New Columns on Estimate Detail Tab

Many new columns have been added to the Estimate Detail tab's columns manager, including:

  • Manufacturer Part Number
  • Number of Trucks
  • Production Method
  • Quantity with Waste
  • Tax Percent
  • Work Type
New Units of Measure

Many new units of measure have been added to B2W Estimate:

  • Site (SITE)
  • Vertical Square Foot (VSF)
  • Loose Cubic Yard (LCY)
  • Cubic Yard Trucked (CYT)

Saving Templates to Resources

FeatureDescription
Save Estimate Items Back to Item DatabasesB2W Estimate now allows you to save estimate items back to the Item Databases area for use in future estimates.
New Columns in Resources and Item Databases Areas

To help identify resources and item templates, several new columns are now available:

  • Created From Estimate Name
  • Updated From Estimate Name
  • Updated From Estimate On

B2W Management Reporting Enhancements

FeatureDescription
Redesigned Report Headers and Footers
  • Filter and grouping settings are now shown in the header area
  • Page numbers and time stamps now appear in the footer area
New Drill Downs
  • Vendor Detail -> Estimate Vendor Material Summary
  • Sub Utilization -> Estimate Subcontractor Item & Task Summary