What's New in B2W Estimate 2012.1

Modified: 24 Sep 2026 B2W Estimate

New features in B2W Estimate 2012.1

B2W Estimate 2012.1 introduces a series of highly requested new features designed to bring even more power and flexibility to your fingertips.

  • Rich text formatting - B2W Estimate now allows you to utilize rich text within item descriptions, notes on bid forms and RFQs, and within the terms and conditions that appear near the bottom of your private bid forms.

    Learn more about using rich text

  • Audit trail - For owners of the Enterprise Version of B2W Estimate, it is now possible to have B2W Estimate record all changes that take place within your estimates which may affect the total overall cost, current bid price or target bid price. This feature allows you to easily view a history of changes within any specified scope. For example, you may want to see a record of when - and by whom - a crew's production rate changed, or see how an item's unit price evolved over time.

    Learn more about using the audit trail

  • Recycle bin - Every estimator knows the frustration of mistakenly deleting estimate cost structure, or even mistakenly deleting an entire estimate. Prior to now, the process of retrieving deleted work has been one that was only possible with the assistance of IT personnel, as well as the B2W Technical Support staff. To help avoid these unpleasant situations, B2W Estimate 2012 includes two forms of recycle bins; one on the B2W Estimate Home Page which stores deleted estimates, and another - accessible within the estimate area - which holds deleted cost structure. Simply stated, end users now have the ability to restore recently deleted data such as estimate items, estimate tasks, or even entire estimates.

    Learn more about B2W Estimate's recycle bin

  • Assign items to estimators - B2W Estimate now allows you to assign individual items within your estimate to specific estimators, allowing users to apply filters which help them focus only on items where they’ve been assigned as the estimator. To assign items to an estimator, simply use the columns manager on either the Item Listing or Item Pricing tabs to enable the Estimator column, then use the new column to select the name of the estimator.
  • Fuel info on Item Listing and Estimate Detail tabs - B2W Estimate’s already powerful Item Listing tab now includes several additional columns which allow even more insight into fuel information at the item, task and crew level. Similar columns are also available within the Estimate Detail tab’s grid area as well. To enable these new columns, simply right-select the column header area on either tab, and use the Columns Manager to select any combination of the following new columns:
    • Total Fuel Cost
    • Total Fuel Gallons
    • Total Fuel Liters
    • Fuel Type (Not selectable in item-only views)
  • Create Subcontractor and Vendor RFQ Groups based on sub types - B2W Estimate now allows you to create Subcontractor RFQ Groups based on work subtypes, in addition to the traditional work types. You may also associate work subtypes with your subcontractors on the Subcontractor Detail tab in Resources. Similarly, you will also have the ability to create Vendor RFQ Groups based on material subcategories, in addition to the traditional material categories, and may also associate material subcategories with your vendors on the Vendor Detail tab in Resources.
  • Ability to specify that fuel costs should not be updated when replacing an equipment rate class - Traditionally, B2W Estimate has automatically updated fuel costs throughout an estimate whenever you trigger the Replace Equipment Rate Class feature. In B2W Estimate 2012, there is a new setting within the Options dialog which allows you to disable this portion of the Replace Equipment Rate Class feature. This setting is found within B2W Estimate's Options dialog, on the Cost Components | General page, and also on the corresponding page in Estimate Options. This option is enabled by default.