Skip to main content

What's New in B2W Estimate 2013.1

Modified: 24 Sep 2026 B2W Estimate

What's New in B2W Estimate 2013.1

B2W Estimate 2013.1 introduces a series of highly requested new features designed to bring even more power and flexibility to your fingertips.

New Feature Overview

  • Named Trucking Types - You may now create a list of named trucking types within the Options dialog. Each named trucking type includes a default unit of measure, capacity, and a default hourly cost. Each trucking component you create may be linked to a named trucking type. When you make changes to a named trucking type, the trucking components linked to the named trucking type are automatically updated to reflect the new values.
  • Replace Named Trucking Type in Estimate - You may replace one named trucking type for another, either throughout your estimate as a whole, or throughout a portion of your estimate.
  • Import takeoff quantities from Excel - When importing pay items into your estimate from an Excel spreadsheet, you may now import both bid quantity and takeoff quantity.
  • Titles on Contacts - You may now enter a title for each contact within your organization resources.
  • Link Trucking Quantity to Material - Trucking quantities may now be linked to that of a sibling material component.
  • Override Trucking Unit Cost - You may now override a trucking component's calculated unit cost, allowing you to ensure the unit cost you prefer is used for costing.
  • Show Balanced Bid Price on Status Bar - B2W Estimate now allows you to show Balanced Bid Price on the Estimate Status Bar.
  • Display Self Performed Unit Cost for Subcontracted Comparison Items and Tasks - The unit cost for the self-performed option of a comparison item or task is now visible on the Estimate Detail tab when viewing comparison items or tasks.
  • Prompt for updating the number of labor components when updating the number of equipment components - After changing the number of equipment components within an item, task, or crew, B2W Estimate now prompts you to specify whether a corresponding change should be made to a sibling labor type. This prompt will also appear when deleting equipment components.
  • View Resources Notes in the Estimate - Resource notes may now be viewed for the components that have been added to an estimate.
  • Categories for Named Factors - The named factors stored within the Options dialog may now be categorized. When selecting a factor within the Set Selected Value dialog, your list of factors will be grouped by category.
  • Add Hyperlinks as Estimate Attachments - The estimate attachments feature now allows you to link to external files, folders, or web sites via hyperlink.
Submit

Table of Contents