What's New in B2W Estimate 2013.2

Modified: 24 Sep 2026 B2W Estimate

What's New in B2W Estimate 2013.2

B2W Estimate 2013.2 introduces a series of highly requested new features designed to bring even more power and flexibility to your fingertips.

New Feature Overview

  • WBS Databases - You can store Work Breakdown Structure levels in a database so that they can be used in either a “Pay Item and WBS” estimate or a “WBS Only” estimate. While WBS Levels can be created directly in an estimate, by creating them in a WBS Database, you can ensure that a standard breakdown of work is available to be added to your estimates. WBS databases are available only in the Enterprise Edition.
  • WBS Estimates - You can create "WBS Only" and "Pay Item and WBS" estimates using WBS levels from you WBS database. WBS estimates are available only in the Enterprise Edition.
  • Summations - With Summations, you can calculate the quantities of WBS Levels and Tasks in an estimate from the rolled up quantities of the children which share the same Unit of Measure. You can also opt to exclude children from a summation. This enables you to precisely configure how quantities are calculated.
  • Calculate Crews Days from Man Hours Limited by Production Hours - Set your Man Hours based crews to take into account the productions hours for the crew when calculating the total days the crew will have to work.
  • Display Bond Table as “Dollars Per Thousand” - View your Bond Tables in terms of “Dollars Per Thousand” for each bond level rather than as a percentage.