"Unsuppress All Items" Context Menu Option on the Estimate Detail Tree

A new option to unsuppress groups of items has been added to the Estimate Detail tab’s tree view. The “Unsuppress All Items” option appears on grouping nodes and will change the suppression state on all items within that group.

Option to Omit the RFQ PDF when Contacting Subcontractors and Vendors

This allows you to send a message to the subcontractors or vendors you have included in your RFQ Groups without resending the RFQ PDF file.

Option to Not Duplicate the “Sent” Logs for Bid Forms and RFQs When Duplicating an Estimate

When creating a new estimate from an older one, you have the option to not duplicate the Sent logs for the bid form and RFQs to reflect the fact that the duplicate is meant to be a new estimate which has not yet been sent out for bid or had quotes requested for it.

Separate Estimate Check Wizard for Zero and Negative Costs

Previously there was one Estimate Check Wizard that tested items in the estimate for zero or negative cost. This version splits those into two separate check wizards since negative cost likely has a different meaning (ex: a credit from the owner) than zero cost (ex: the item doesn’t have cost assigned to it yet).

Filter the "Similar Materials" List by Category and Subcategory in the Create New Material Dialog

In the Create New Materials dialog, the “Similar Materials” list is intended to help prevent an estimator from creating a new estimate material when there is already one with a different spelling for the same material. The list shown will now be filtered to show only materials with similar names which have the same Material Category (and Subcategory) if those values are specified for the new material.

Estimate Check Wizard Results Dialog Notification Label That Suppressed Items Were Omitted From the Check

The Estimate Check Wizard allows you to skip performing checks on suppressed items. This feature simply adds a label to the result as a reminder when that option was chosen.

On Subcontracted Items and Tasks which are part of an RFQ Group, there is a link with the RFQ Group’s name that you can select to navigate directly to the RFQ Group.

Calculate Profit by Man Hours

You can now calculate the profit for the bid as a specific dollar amount per man hour in the estimate.

Calculate Profit by Crew Days

You can now calculate the profit for the bid as a specific dollar amount per crew day in the estimate.

Option for Adding Default Indirect Items When Creating a New Change Order

When you create a new change order, you have the option to also include the default indirects that are included when a new estimate is created.

New Standard Report: Crew Component Listing with Custom Production Notes

There is a new standard report that shows the crew components in your estimate as well as the custom production notes for each one.

Option to Create Only an Estimate Version of a New Category Value

When you create a new category value like Work Type or Material Category, you have the option to create them only within that estimate, rather than allowing the new category value to be create both in that estimate and in Tools Options.

Equipment Hours / UM Column on Item Listing, Item Pricing, and Estimate Detail Child Grids

A new column is available on the Item Listing, Item Pricing, and Estimate Detail tab child grids that shows the Equipment Hours per unit of measure of the Item, Task, or Crew the hours are rolled up to.

Conditional Formatting by Equipment Hours / UM

On the Item Listing and Item Pricing screens, you can now setup conditional formatting based on the value of the Equipment Hours / UM column.

Equipment Hours / UM Tool Tips in Estimate Detail Tab Summary Grids

The Summary grids on the Estimate Detail Tab for Items, WBS Levels, Tasks, Crews, and Cost Groups have been updated with tool tips to show the Equipment Hours / UM and Units per Equipment Hour.