Skip to main content

What's New in B2W Estimate 22.2

Modified: 24 Sep 2026 B2W Estimate

What's New in B2W Estimate 22.2

Import Subcontractor Quotes

You can now import quotes for items and tasks from subcontractors in the Subcontractor RFQ Management area. Estimate reads quotes in both Excel spreadsheets and Fillable PDFs that can also be generated for RFQs to subcontractors.

After reading and parsing the import file, Estimate will display the list of items and tasks for the selected subcontractor with the quote prices preset for your review. The import file is also shown in spreadsheet format to allow you to verify that the correct prices were selected and make edits, add in a new header row, or manually select the prices yourself.

Import Vendor Quotes

You can also import vendor quotes with the option to bring in the Base Cost for materials as well as any Truck Pricing the vendor has provided.

Fillable PDF for Subs and Vendors

You can now generate your subcontractor and vendor RFQ attachment files as Fillable PDFs. This allows the subcontractor or vendor to directly enter their pricing into the attachment file, guaranteeing that the items/tasks/materials they quote will be the ones they have been requested to provide pricing on.

B2W Fillable PDFs are also directly readable by the Import Quotes feature to ensure that the right data is imported every time.

Quote Packages

The Quote Packages feature allows you to group quotes for multiple RFQ Groups into packages for each bidding subcontractor or vendor. This is useful when the subcontractor or vendor indicates that they require all the items/tasks/materials be awarded to them rather than accepting an award of one RFQ Group but not another.

Compare Quote Packages

The Compare Quote Packages dialog allows you to see how subcontractor and vendor quotes and quote packages line up against others when comparing the total pricing across multiple RFQ Groups and then assign the RFQ Groups to the subcontractors and vendors.

Set Quotes to “No Bid”

This feature allows you to indicate that a subcontractor or vendor will either not be bidding on a specific item/task/material or will not be bidding at all.

Partial DBE for Subcontractors

With this feature you can specify that the work awarded to a subcontractor can be partially counted towards a minority participation requirement, either as a percentage of the value awarded to the subcontractor or as a flat dollar amount. There is also a new Minority Participation dialog available on the Summary tab that shows how minority participation is allocated among subcontractors, trucking, and vendors.

Order and Group Subcontractor RFQ Reports

A new settings page allows you to specify how the items and tasks shown in a Subcontractor RFQ Report will be ordered and grouped. Options include grouping by Phase, Alternate, and Work Type as well as ordering Items by description or Item Number.

View Subcontractor Resources Notes in RFQ Management

The notes on a subcontractor in Resources are now visible when viewing the subcontractor in RFQ Management.

Estimate API Enhancements

The Estimate API has been updated to include the ability to read the properties of items and tasks in an Estimate.

TID Login Integration

A new login option has been added for users who have a Trimble ID set up. Administrators can now tie the email associated with a Trimble ID to a user profile in Estimate, allowing that user to log in using the Trimble ID login.

Submit

Table of Contents