Cost Breakdown Element Edit
Each estimate item within a job contains one or more cost breakdown elements which represent estimated costs, quantities, and hours. Each cost breakdown element may also include one or more materials, which represent the estimated material costs for the estimate item.
Getting Started
Use the Cost Breakdown Element Edit page to edit information about a specific cost breakdown element. To navigate to the Cost Breakdown Element Edit page, open any job, click the Estimate Items tab, then click the Edit button to the right of the cost breakdown element you want to edit.
Cost Breakdown Element Glossary
- Cost Breakdown ID - An ID number associated with this cost breakdown element. (Required)
- Description - Enter a description for your cost breakdown element. (Required)
- Item ID - Another ID number, typically a reference to the cost code to which this element relates.
- Item Description –
- Estimated Quantity - The estimated quantity for your cost breakdown element.
- Unit of Measure - Enter the unit of measure associated with this cost item. (Required)
- Estimated Unit Cost - A calculated value which represents the sum of all unit costs within the Estimated Costs area below.
- Projected Unit Cost – Shows projected unit cost based on detailed cost projections.Note: This setting only appears when both the Enable Detailed Job Cost Projections setting in Business Units and View Detailed Job Cost Projections on Jobs Security Role setting are enabled.
- Estimated Total Cost - A calculated value which represents the sum of all total costs within the Estimated Costs area below.
- Projected Total Cost – Shows total projected quantity. Note: This setting only appears when both the Enable Detailed Job Cost Projections setting in Business Units and View Detailed Job Cost Projections on Jobs Security Role setting are enabled.
- Estimate Item - An estimate item from the current job to which this element is associated. (Required)
Estimated Costs Area
In the Estimated Costs area, you can enter or edit cost information, and hours where applicable, for a variety of categories such as labor, equipment, materials, and subcontractors.
Materials Area
For each material appearing within the Materials area, you can enter or modify estimated quantities, unit costs or total costs. To add new materials to your cost breakdown element, click the Add Materials button.
Common Actions
On the Cost Breakdown Element Edit page, you can perform these actions:
To save the changes you have made within the Edit page, click Save. There are two instances of this button, one near the top of the page and one near the bottom.
To cancel the changes you have made within the Edit page, click Cancel. There are two instances of this button, one near the top of the page and one near the bottom.