Use Maintain Programs to create plans for routine and preventative maintenance for your fleet. Programs generate maintenance requests based on calendar and meter readings from work orders, field logs, and equipment logs. Managers can then create and schedule work orders from these automatically generated requests.

The Maintain Programs page is not accessible to users with a Mechanic license.

Getting started

Accessing the Programs page

To navigate to the Programs page, click MAINTAIN in the navigation bar and select Programs.

Collapsing and resizing panes or sections

Collapse the list pane and Overview section to provide more space on your screen to view the Items section. You can also resize the list pane.

  • To collapse a section or pane, click the gray triangle or double-click anywhere on the blue bar next to the list pane or Overview section.
  • To re size the list pane, hover over the blue bar next to the list pane until you see double arrows, then drag the list pane horizontally.
Search, sort, and filter the list pane Search

The Search field can be used to find a maintenance program in the list. You can use the Search field even after you have set business unit filters. The search string is not case sensitive.

  • Click in the Search field and start typing letters or numbers from the name or ID of the program you want to find. The list filters as you type. Consider this example:
    • Type O and the list might display programs with the words: excavator, forklift, or roller in the description.
    • Type OR and the list might display programs with words excavator or forklift in the description.
    • Type ORK and the list might display only the program with the word forklift in the description.
Sort

The list can be sorted by ID or Description.

  • Click the ID or Description column heading to sort the list. The triangle icon next to the column heading changes to indicate the current sort order.
Filter

You can filter the Programs list by business unit.

  • In the Select Business Unit field, select or begin typing the name of a business unit. The menu list changes to show only items that match the characters you type. You can select one or multiple filters.

Programs Areas

Programs List Pane

The Programs list pane appears at the left side of the Programs page and lists all maintenance programs that have been created. Select a program to view its details in the Details Pane.

On the list pane you'll find controls for:

  • Search, sort, and filter the list
  • Create a new maintenance program

Programs Details Pane

The Programs Details Pane, on the right side of the Programs page, displays the overview, items, and equipment of the selected maintenance program.

The Details Pane contains the following sections:

Header

Includes the program name and buttons for the following actions:

  • Copy
  • Edit
  • Delete
  • Add equipment
Overview

Displays the following information about the program:

  • Business Unit – The division or branch of your organization associated with this program.
  • Labor Rate Class – The set of labor rates associated with this program.
  • Notes – Use this field to record helpful information about this program.
Items

An item is a service task. Each maintenance program consists of one or more items. For example, a program might include items for maintenance to be performed at 100 hour intervals, 250 hour intervals, 500 hour intervals, and so on. Each program item and its associated information — Details, Intervals, Attachments, Exclusions, Hours, and Parts — can be viewed by selecting a specific item tab in the details pane.

Equipment on this Program

Add equipment after creating the program.

The equipment belonging to the selected program appears in alphabetical order with the following details:

Click on a piece of equipment to expand its details for the selected program.

  • Frequency – How often the item is triggered. service interval is required.
  • Current Reading – The most current meter reading on the piece of equipment.
  • Last Generated – The meter reading when the interval was last generated. You can also manually generate the program maintenance item by clicking the Generate Item button.
  • Generated By – How the interval was generated; System or User. If System displays, the interval was automatically generated by the software. If a User name displays, the interval was generated manually by a logged in User.
  • Last Completed – The meter reading when the interval was last completed. This may be blank if the interval has been generated but has not been completed.
  • PM Lead Time – The amount of time before the due date that the User wants the interval to trigger before actually due.
  • Next PM Request –The meter reading or date that the interval is scheduled to generate next. You can change the meter value for the Next PM Request by clicking the Edit icon and entering a new value.

About Program Intervals

Intervals are the meter based or calendar based values used to determine a maintenance schedule. Once the equipment reaches an interval, a maintenance request is generated.

Set intervals for your programs not only on your equipment schedules, but also your ability to get the work done. If your organization does not have telematics or a good process to get meter readings at least weekly, it is recommended that you set calendar-based intervals instead of meter-based intervals.

Choosing Meter Based or Calendar Based Intervals

Meter Based

Choose Meter Based intervals when the intervals are based on meter readings received from equipment. For example:

  • Hour Meter
  • Odometer
  • Fuel Meter

A meter must be added to a piece of equipment before it can be added to a Meter Based Program.

Calendar Based

Choose Calendar Based intervals when the maintenance is based on an interval of time. For example:

  • Annual inspections
  • Registrations
  • Services for equipment without meters
Choosing Planned Completion Reading or Actual Completion Reading

The Actual Completion Reading option is most commonly used.

Planned Completion Reading

Uses the meter reading when the PM Interval was generated to calculate the next time that Interval will generate a PM Request.

  • 250 Hour Interval – PM completed at 255, next PM Request will be 500 (assuming you have no variance set)
  • 250 Hour Interval – PM completed at 230, next PM Request will be 500 (assuming you have no variance set)

Use Planned Completion Reading only if you can guarantee that each interval item will be completed on time, every time.

Actual Completion Reading

Uses the meter reading when the Interval was completed to calculate the next time that Interval will generate a PM Request

  • 250 Hour Interval – PM completed at 255, next PM Request will be 505 (assuming you have no variance set)
  • 250 Hour Interval – PM completed at 230, next PM Request will be 480 (assuming you have no variance set)

If using levels in the first example, the 500 will still generate at 500 regardless of how late the 250 service is completed. If using levels the second example, the 250 will generate early at 480 and the 500 will generate a short time later. Recalculations do not impact higher-level intervals, only the selected interval and lower-level intervals.

About Program Levels

Levels determine an item's priority in a program: higher levels override lower levels. When a higher level reaches its interval value, any lower levels are suppressed, and only one maintenance request for the higher-level interval is generated. Therefore, tasks and parts at lower-level intervals are included into the higher-level intervals.

It is up to you to decide whether using levels works for your organization. Before you create a program, decide if you will use levels and if more than one program is needed to accommodate different service needs.

When using levels, higher level intervals must be divisible by lower level intervals.

Example of Program structure

The following table shows how levels work within programs and alongside other programs to complete the equipment's maintenance requirements. Notice that the higher levels include the maintenance from lower levels, and higher-level intervals are divisible by lower levels.

Example of requests generated with levels vs. no levels

The following table shows how requests are generated when levels are used within an item. Notice the level 3 item contains both the level 2 and level 1 maintenance tasks.

The following table shows how requests are generated when not using levels in a program item. Many more requests are generated.

Not using levels

If you decide not to use levels, all interval items will need to be set to "1" by the user, and all intervals will generate maintenance requests based on their own cadence.

Use this approach when it is important to document each interval level independently, or if you do not always complete intervals in a timely manner.