This page provides instructions for working with Maintain Programs.

Creating programs

This section includes an overview of the steps for creating maintenance programs and details for working with the different parts that make up a program.

Requirements for Programs

Maintenance programs must meet the following criteria to function properly:

  • Program meter type and equipment meter type must match
  • Equipment in a program should have all the same or similar preventive maintenance schedule
  • Never mix intervals of different meter types
Overview of creating programs
  1. In the list pane, click New Maintenance Program.
  2. Fill out the following fields in the New Maintenance Program window. Fields with a red asterisk are required.
    • Description – Briefly explain the program. If your program needs further explanation, use the Notes field.
    • Business Unit – Choose which business unit the program fits under.
    • Labor Rate Class – Choose which labor rate class the program fits under.
    • Notes – Add notes that help describe the program. Notes follow a program life cycle, while comments are associated with specific actions.
  3. Click Add Item to open the Add Request Template window. An item is a service task. A maintenance program requires at least one item.
  4. Complete the required fields in the Add Request Template and click Save.
  5. In the newly created item, locate the Intervals section and click Add Interval. This opens the New Interval dialog. Every item must have at least one interval.
  6. Complete the required fields in the New Interval dialog and click Save.
  7. Continue to add items as needed.
  8. Click Save to save the program. Your new maintenance program will display in the Programs list. Select the program from the list to begin adding equipment to the program. See Manage a program's equipment.
Add Items to the Program

Click Add Item. The Add Request Template dialog opens. Fill out the following fields:

  • Item Description – A brief explanation of the service. If the item needs further explanation, use the notes field.
  • Type – Select the type of request from the menu. This list is populated and user-defined from the Maintenance Request Type category found on the Categories page in the Setup area. Request types include Inspection, Preventive Maintenance, and more.
  • Priority – Select the priority of this request from the menu. This list is populated and user-defined from the Maintenance Request Priority category found on the Categories page in the Setup area.
  • Level – Enter a number to define the priority of this item if there are scheduling conflicts. Greater numbers have precedence.
  • Notes – Use this field to further explain the program item by telling the mechanic what to do.
Edit Details

After you save an item in a program, it is displayed on the New Maintenance Program page with the Details section expanded. The section contains the fields listed below. All required fields were filled in the Add Request Template dialog. Edit the required and optional fields as necessary.

  • Item Description – As entered in the Add Request Template dialog.
  • Type – The maintenance type selected in the Add Request Template dialog.
  • Problem Code – The mechanical symptoms that generated the request.
  • Component Code – A part or assembly within a piece of equipment.
  • Subcomponent Code – A subcomponent of the component selected above. Unavailable until you select a Component Code.
  • Failure Code – The condition that caused the problem. Unavailable until you select a Subcomponent Code.
  • Action Code – The action needed to correct the problem. Unavailable until you select a Failure Code.
  • Priority – As selected in the Add Request Template dialog.
  • Level – As specified in the Add Request Template dialog.
  • Notes – An open text field for entering miscellaneous text information about this program.
Add Intervals

Your maintenance program will automatically generate a repair request at the interval you define here.

In the Interval section:

  1. Click Add Interval to open the New Interval window.
  2. Enter a description describing the set of Program Intervals and their relationship.
  3. Select Meter BasedIntervals follow readouts from different types of meters on the equipment. or Calendar BasedIntervals are based on the passage of time. . Keep in mind that equipment without meters can use only calendar-based intervals.
    • If you select Meter Based, specify the type of meter and the length of the interval. The meters that appear here have been defined under Categories in the Setup area.  
    • You have two choices for scheduling the next time this maintenance will be requested, either Planned Completion Reading or Actual Completion Reading.
  1. Enter a value for the Generate repair requests for this item field. The value in this field appears in the PM Lead Time column in the Intervals section in the program item's details.
  2. Select the Interval Duration check box to specify when to end this interval. Setting an interval duration will limit the number of times the interval generates a repair request. When you select Interval Duration, the following choices appear:
    • End by – Enter a specific date for the interval to stop.
    • End after ... occurrences – Enter the number of times to repeat the interval.
    • End after ... Hour(s) – Enter a specific number of hours for the interval to repeat.
Example: Planned vs Actual completion readings

Your maintenance program calls for an air filter to be changed every 1,000 hours, but it isn't changed until 1,100 hours. If you choose planned, the next filter change will be requested at 2,000 hours. If you choose actual, the next filter change will be requested at 2,100 hours.

Example: Metered vs Non-metered equipment

You have two of the same model excavator — one with an hour meter and the other without. In this case the excavator without the hour meter can use only calendar-based maintenance program items.

For this reason, you might choose to define both meter-based and calendar-based intervals for the same item.

If you want to use only a meter-based interval, the equipment must have the appropriate type of meter. Add meters to a piece of equipment on the Equipment page in the Resources area.

Add attachments

Use the Attachments section to add maintenance instructions, service manuals, and other helpful documentation to the items in a program. Attachments you add here will be added automatically to repair requests generated for this item.

  1. Click New Attachment to open the New Attachment window. Note that this is available only on saved programs.
  2. Click Browse, select a file from your computer, and click Open.
  3. (Optional) Enter a description of the file you want to attach.
  4. Click Save.

The attached file will appear in the Attachments section with the following information columns:

  • File Name – The name of the attached file.
  • Description – Describes the attached file.
  • Added by – The user who added the attached the file.
  • Added on – The date when the file was added.

Note the following: 

  • Click a column heading to sort the list by that column.
  • To edit an attachment, click Edit beside the attachment you want to edit.
  • To delete an attachment, click Delete beside the attachment you want to delete.
Add exclusions

The Exclusions section displays a list of the twelve months of the year. Select the check boxes next to the months that the equipment will be out of use. This suspends the maintenance program for those months.

Add hours

Use the Hours section to enter details about the amount of time needed to perform the maintenance operation. You also specify the type of labor required in this section.

  1. Click Add Hours to open the Planned Hours window within the work item. Complete the following fields:
    • Description – Summarizes the purpose of the hours reported.
    • Labor Type – Selected from the job titles listed in the Resources area.
    • Planned Hours – The amount of time estimated to complete the work.
  2. Click Save.
Edit or delete planned hours
  • Click Edit to open a planned hours line item for editing.
  • Click Delete to delete a planned hours line item.
Add parts

Add the parts required for the planned maintenance to ensure that the required parts will be available when it is time to service the equipment.

  1. Click Add Parts to open the Add Parts window within the work item.
  2. Select the parts you want to add. Note that when the Add Parts to Maintenance Program window first opens, it lists all parts. To find a part:
    • Scroll through the parts list
    • Use the search field above the list. Searching returns results for any part that has a matching string of text in the ID, Description, Category, and Subcategory columns
    • Use the Scan UPC field to scan in a part's barcode using a UPC scanner. Note, the part must exist in the Parts resource and have a valid UPC code for the UPC scan to work.
  3. Select the check box in the ID column for the parts you want to add to the work order, then click Next.
  4. Enter an estimated quantity (Est. Qty).
  5. At this point there are three other options:
    • Click Save to add the selected parts to the program
    • Click Previous to go back to the previous screen to make revisions.
    • Click Cancel to abandon the operation.

Manage a program's equipment

After you save a maintenance program, you can add equipment from your database in the Equipment on this Program section. If the program is meter based, the equipment must contain a meter or you will not be able to add the equipment. After equipment has been added to a program, you have the option of deleting equipment from a program and editing equipment intervals. Equipment details can only be edited from the Equipment page.

Add equipment
  1. Click Add Equipment at the top of the details pane. The Add equipment to "[program name]" window appears with a list of available equipment.
    • You can filter the list by Equipment ID, Description, Category and Equipment Type. Click the filter icon next to a column header to enter your filter criteria.
  2. Select the check box beside the Equipment ID that you want to add to the program.
  3. Click Finish.

The equipment is added and can be viewed in the Equipment on this Program list.

Program meter type and equipment meter type must match in order for the maintenance program to function correctly. A message will alert you to any equipment that does not have the meters to run the selected program.

Delete equipment
  1. In the Equipment on this Program section of a selected maintenance program, click Delete beside the equipment you want to remove.
  2. Click OK to proceed.
Edit equipment intervals
  1. Click Edit at the top right of the detail pane. This opens the Edit Maintenance Program window.
  2. In the Intervals section, click Edit beside the interval you want to change. This opens the Edit Interval dialog.
  3. Change the interval as needed.
  4. Click Save to save the item or Cancel to close the dialog and discard any changes.

Other tasks

This section provides instructions for additional tasks you may need to perform to manage your maintenance programs.

Generate a program item manually

In some cases you may need to manually override the dates or meter readings that trigger maintenance items. Follow these steps: 

  1. Select a maintenance program.
  2. In the Equipment on this Program section, click Generate Item next to the item you want to generate.
  3. The Generate Item confirmation dialog appears. 
    • Click Yes to generate the Repair Request.
    • Click No to return to the Programs page.

You can view the repair request in the list pane on the Requests page.

Copy a program
  1. Click Copy at the top of the details pane. This opens the Edit Maintenance Program window.
  2. Adjust the information as needed in the copy and click Save.
Edit a program
  1. Click Edit at the top of the details pane. This opens the Edit Maintenance Program window.
  2. Edit any details and click Save.
Delete a program
  1. Select a program from the list.
  2. Click Delete at the top of the details pane.
  3. Click Yes to confirm.