The Jobs — Tracking Account Edit page allows you to edit information pertaining to a specific tracking account — including estimate item cost breakdowns and change order cost breakdowns. Tracking accounts represent the items you want to track within a particular job. There are two types of tracking accounts: production accounts Production accounts represent the actual work to be performed. and overhead accountsOverhead accounts represent a variety of trackable items such as fuel consumption, lunch hours, or safety meetings..

Accessing the Jobs – Tracking Account Edit page

To access the Jobs — Tracking Account Edit page, click Jobs on the navigation bar, click the Job Number or Job Title for the job you want to work with, click the Tracking Accounts tab, then click Edit next to the job production or overhead account you want to edit.

Getting started

Production accounts glossary

The following fields are relevant to the columns in the Job Production Accounts section of this page.

  • Tracking ID – A job-specific tracking number used to identify this account. Tracking IDs are typically created using a combination of an item number and account number. (Required)
  • Account ID – The ID associated with the master account to which this tracking account is related. This ID is used when exporting information to accounting. (Required)
  • Description – The name of the production account. (Required)
  • Unit of Measure – The unit of measure associated with the account. (Required)
  • Estimated Production Rate – The estimated production rate for this account. There is a setting within the B2W Estimate detail export to B2W Operational Suite which enables passing this information from B2W Estimate to B2W Track.
  • Complete – Select this check box to hide the job tracking account from view in the Add to Field Log and Add to Work Log dialogs.
  • Supervisor Projected Unit Cost – A manually entered unit cost—the supervisor's best guess at the projected unit cost of this account at completion. Use primarily for reporting purposes.
  • Manager Projected Unit Cost – A manually entered unit cost—the project manager's best guess at the projected unit cost of this account at completion.  Use primarily for reporting purposes.
  • Projected Unit Cost – Shows projected unit cost based on detailed cost projections. If no projected unit cost exists, this will default to blank (no value).
  • Projected Unit Cost Override – When Yes, user is able to edit total projected quantity.
  • Total Projected Quantity – Shows total projected quantity. If no total projected quantity exists, this will default to blank (no value).
  • Estimated Quantity – The estimated quantity of production for the account.
  • Change Order Quantity – Adjustment to the original estimated quantity made through a change order. Values in parentheses are a decrease from the original quantity.
  • Total Estimated Quantity – The quantity associated with an estimate item after adjustments made through a change order. (Estimated Quantity plus the Change Order Quantity.)
  • Total Reported Quantity – The total quantity from all field logs, work logs, and true-ups which reference this account.
  • Unit Cost – The cost per unit for an estimate item.
  • Total Cost – The total cost for an estimate item.
  • Estimated – The price or cost as originally estimated.
  • Change Order – The amount of change, if any, as the result of a change order.
  • Total Estimated – The sum of the estimated price or cost and the corresponding change order amount.
Overhead accounts glossary

The following fields are relevant to the columns in the Job Overhead Accounts section of this page.

  • Tracking ID – A job-specific tracking number used to identify this account. Tracking IDs are typically created using a combination of an item number and account number.
  • Account ID – The ID associated with the master account to which this tracking account is related. This ID is used when exporting information to accounting.
  • Description – The name of the specific overhead account item.
  • Value Type – The value unit used for this account.
  • Cost Calc. Type – The method used to calculate the cost; either Unit Cost or Percentage.
  • Default Type – A value that will be used for calculations if no other value is set.
  • Complete – Select this check box to hide the job tracking account from view in the Add to Field Log and Add to Work Logs dialogs.
  • Projected Unit Cost – Shows projected unit cost based on detailed cost projections. If no projected unit cost exists, this will default to the same value as Estimated Unit Cost.
  • Projected Unit Cost Override – When Yes, user is able to edit total projected quantity.
  • Total Projected Quantity – Shows total projected quantity. If no total projected quantity exists, this will default to the same value as Total Estimated Quantity.
  • Estimated Hours – The estimated hours for the overhead account.
  • Change Order Hours– Hours added to (or subtracted from) the estimated hours.
  • Current Hours – Hours after adding (subtracting) the change order amount.
  • Reported Hours – The quantity or amount reported within field logs and work logs that reference this overhead account
  • Unit Cost – The cost per unit for an estimate item.
  • Total Cost – The total cost for an estimate item.
  • Estimated – The cost as originally estimated.
  • Change Order – The amount of change, if any, as the result of a change order.
  • Total Reported – The sum of quantity, unit cost, total cost, labor hours, and equipment hours for the selected job overhead account.
Expand or collapse a section
  • To collapse a section, click the collapse icon (brown triangle) to the left of the section's name.
  • To expand a collapsed section, click the expand icon (brown triangle) to the left of the section's name.

The expanded/collapsed state of each section is saved, even if you close and reopen. If you collapse a section on the View page, it will also appear in a collapsed state on the Edit page.

Working with Estimate Item and Change Order Cost Breakdowns

Estimate item and change order cost breakdowns can only be managed through the Tracking Account Edit page.

Estimate Item Cost Breakdown section

In this section, you will see a list of cost breakdown elements associated with the selected tracking account. Cost breakdown elements are what give a tracking account its estimated values.

Change Orders Cost Breakdown section

In this section, you will see a list of change order cost breakdown elements associated with this tracking account. Cost breakdown elements are what give a tracking account its estimated values. To view the details for one of the cost breakdown elements on the list, click the ID or Description for the cost breakdown element you want to view while in View mode.

Add estimate item or change order cost breakdown element

  1. Click Add Estimate Item Cost Breakdown Element or Add Change Order Cost Breakdown Element.
  2. Use the Search field, letters, and # to search for breakdown elements you want to add.
  3. Select the check boxes next to the cost breakdown elements you want to add.
  4. Click Add.

  If you see no cost breakdown elements listed within the Add Cost Breakdown Elements or Add Estimate Item Cost Breakdown box, then all cost breakdown elements within this job are already associated with tracking accounts.  You will need to navigate to the Estimate Item View page to create a new cost breakdown element before proceeding.

Delete estimate item or change order cost breakdown element

  1. Click Delete near the cost breakdown element you want to delete.
  2. Click OK to confirm deletion.