In this release you’ll find the new Production Targets feature and enhancements to B2W Track and B2W Schedule along with bug fixes.

B2W Operational Suite

SQL 2017 Support

The B2W Operational Suite now supports Microsoft SQL Server 2017.

B2W Track

Production Targets

Set daily targets for production quantities by job for scheduling production work and crew resources, and for tracking of job performance and crew productivity.

  • Create and modify targets from the Jobs area or within Schedule.
  • View targets within Jobs, Schedule, and on Field Logs in Track.
    • Foremen and other Track users can see target quantities and variances when entering or reviewing information on the field log.

Employee Sign off Enhancements

Significant updates have been made to Employee Time Cards & Signatures functionality in B2W Track, including:

  • New “Time Cards” tab in Track (web application), where authorized users can review Employee Time Cards and signature documents.
  • Daily or Weekly Employee Time Cards (configurable per Business Unit via Settings).
    • Time Cards aggregate employee hours from multiple field logs (per day or per week).
  • Ability for multiple employees to sign off on Time Cards with hours from the same Field Log simultaneously.

B2W Maintain & Schedule

Current Equipment Location Enhancements

Equipment resource records - location section will now be visible to all of the B2W Operational Suite modules.

The current location of equipment resources is now determined and updated automatically based on completed equipment moves in B2W Schedule, imported telematics location data, and manual updates by users. Enhancements have been made to the way equipment location information is displayed throughout the application:

  • Resources – Equipment view
  • B2W Schedule – Schedules, Location Overview and Map
  • B2W Maintain – Equipment view, Work Order view (“Find Nearby Maintenance”)

B2W Schedule

Production Targets

You can view and manage job production targets on B2W Schedule and allocate resources to achieve job productivity goals.

Crew Templates Enhancements

You can now modify in-use crew templates in B2W Schedule. The following changes to crew details will update throughout the Schedule application:

Production crew details modifications:
  • Update current or future assignments for crew members that have been added, removed, or replaced.
  • Update production targets if the foreman has been added, removed, or replaced.
Transport crew details modifications:
  • Update current or future move assignments that have not been completed.

B2W Mobile App

Tablet Sync Enhancements

Improvement to the initial sync process.

Bug fixes in Release 18.2

Track
  • Employee Labor Type list is not supported via B2W Ops Web Services
  • Extreme lag or error when creating a new production account for a jobs
  • Persist Search drop down and text string when navigating away and back to the FL List and Export FL list views
  • Object reference error when attempting to view field log
  • Unable to reallocate quantities after a true up for Multiple Tracking Accounts with the Same Account ID
  • Report "Equipment Scheduled vs. Utilized" does not show Utilized information without Track license
  • "Copy Last Field Log" function does not hold values when creating a new Field Log and copying from the Last Field Log
  • Removing Type from employee section of field log settings does not remove it from grid view
  • Unable to edit and save changes to equipment resource if equipment event description contains '='
  • When 'show cost information on field logs' is not checked, trucking costs does not save to field log
  • T&M Field log reports inconsistent behavior
Maintain
  • Edit WO menu does not prompt for meter field
  • Maintain Schedule: reassigned work order appearing in search for previous mechanic
  • Manual running "Generate Item' will generate requests without limits for Interval duration
  • Fuel Records Import Wizard, CSV Telematic Import Wizard: clicking Import Another button opens Mapping screen instead of Settings
  • Can't delete part from New/Edit Work Order dialog
  • B2W Schedule not picking up work order date changes when using the "drag the edges" feature
  • Search does not consider all fields on the Work Orders tab
  • Part is not Removed from the Select Part drop down when full quantity is received
  • Sort order for time card Work Orders
  • Equipment duplicates employee time card hours
  • Equipment History is not sorting correctly and Search not considering Comp. Code
  • Unable to receive inventory that creates a current inventory of 0
  • Equipment program is not updated when users add new program item
  • Part inventory not updating from work order when changing from inventory to direct buy or when deleting parts
  • WO report print to PDF doesn't fit to page and part # is not exposed
Schedule
  • Crew Templates: Organization drop-down does not support type-ahead on Org ID
  • Location overview: groups/job sites aren't expanded during Find operation
  • Location Overview: Card will not update if Find criteria is entered with no matches or if matched criteria is deleted
  • Location card on map: false "Resolved By Another User" message in some cases
  • Location Overview: an implicit Find operation changes the current selection
  • Location Overview: find by assignment resource breaks opening location card
  • Create FL from Schedule: jobs are copied even if there are only needs with Requested by person
  • Unknown Error when attempting to view Move Order card