Skip to main content

After End of Month Update

Modified: 6 Nov 2026 Jobpac Connect Equipment Help

Once the monthly run has finished and confirmation reports have been produced for every module you can go on to the next stage.

The asset system may be accessed again and all monthly transactions are available for viewing.

At this stage the General Ledger journals are still in the interface file and not posted. There is a parameter to control this. The recommended setting are:

???

To view them, select Check Journal File. This returns a report that lists the transaction that will make up the journals for the General Ledger.

Review this report. If it looks OK, then select Create Journal Batch. This will prepare a number of GL Journals and leave them unposted in the General Journal entry screen.

They can be posted from there.

Submit

Table of Contents