Once all the above reports have been checked you can submit the end of month update.
The first part of the EOM process will run the above reports, and check they are empty (except additions and disposals).
This will run all the asset module monthly processes that calculate and assign costs and charges. General Ledger journals will be created in the asset journal interface file ready for you to review and post. Do not use the asset system whilst the monthly update is taking place.
This uses the standard EOM scheduler. It is important the asset EOM is run separately and before Job Cost EOM, so any hire charges costed to projects will update the jobs before costs are locked in by Job cost EOM. This is not necessary if the Hire Billing function is not used.
FOr details on how to use the EOM scheduler, see End of Month Processing Function Guide.