Jobpac has functionality that allows plant assets to be hired out internally and billed on a daily or monthly basis.
Creating Hourly Billing Rates
To create the billing rates for plant items select Hourly Rates (Timesheets).
The following screen will be displayed.

While on the Income Tab Select will display the following screen.

The income account can be entered, and the specific day and night rates can be entered.
The following details can be entered.
| Term | Definition |
|---|---|
| Work ID | Enter the owning Work ID number |
| Account | Enter the default income account that the revenue from the hire will be allocated to. |
| Dates On Hire/Off Hire | Enter dates for the period that the item is hired out. This is a reference only field and entry is not mandatory. |
| Rates | Enter the hourly rates for the item |
Selecting the Rates tab will display the various hourly rates that apply to the assets.

Entering Plant Timesheets
The details of hourly hire can be entered by Enter Plant Timesheets.

You can prevent the entry and posting of FA plant timesheets if rates are 0 by setting parameter FARATE to Y. This relates to normal rate and Sunday rate. The user will be issued with an error when trying to enter a timesheet if the rate is 0. In posting, the timesheet entries will be rejected and will be highlighted in the posting audit report.
Complete details as required. The following details can be entered.
| Term | Definition |
|---|---|
| Date | Enter the date of the hire |
| Work ID | Enter the owning work id |
| Asset | Enter the Asset Number |
| Sequence No | Enter the sequence number of the transaction against the item. This will be 1 for the first entry and so on. |
| Hours | Enter the number of hours that apply in each category |
| Job | Enter the job number that the asset was used on. The user entering the timesheets must have access to the job being used. This security can be bypassed by using the parameter FAPTSH position 15. |
| Cost Centre | Enter the cost code and cost type that the asset was used on |
| Resource | Enter the Resource code related to the Job (if used) |
| Account | This will default from the cost centre details for the job. Where a job is not charged enter the GL account. |
| Docket No | Enter a Docket no if one applies |
| Shift D/N | Enter D or N depending on whether Day or Night shift rates are to be charged. |
Reviewing and Posting Timesheets
When all the plant timesheets have been entered they are ready to be posted. To review and post a timesheet select Post Timesheets.
The following screen will be displayed.

This screen allows the review and posting of timesheet entries. Enter the following details.
| Term | Definition |
|---|---|
| Start Asset | Enter the first asset for review |
| Finish Asset | Enter the last asset to be reviewed |
| Start Job | Enter the first job to be reviewed |
| Finish Job | Enter the last job to be reviewed |
| Group Code | Reporting Unit, Reporting Sub Unit ā if used enter relevant details (Blank means ALL) |
| Include Transactions Up to | Enter the date of the last transaction to be reviewed |
| Include Non Job related Transactions | Tick to include transactions costed directly to GL accounts |
| Post Timesheets | Tick to automatically post transactions without review. Leave blank to allow for the review of transactions. It is recommended that the setting be left blank initially. This will produce a review report. |
| Report Sequence | Select the sorting sequence required. |
| View the Report | Ensure the check box selected and then select OK |
This will generate a Plant T/S Posting PREVIEW report.
If all transactions are correct re-run the report with the post transactions flag set to Y. This will post the timesheets with the following report.

These transactions post immediately to the job and general ledger. Batch numbers starting with L are used for Plant Timesheet posting.
Reverse Time Sheet Posting
The posted timesheets can be reversed if necessary by Reverse Plant Timesheets.
You need to know the batch number form the posting report. Run first without ticking the Post reversal.

This will generate a Plant T/S Reversal PREVIEW report. If all transactions are correct re-run the report with the post transactions flag set to Y. This will post the timesheets.
This process reverses the transactions in the asset module and to the job and in the general ledger.
Billing Instructions for Hourly Plant Billing
When the timesheets have been completed a Hire billing instruction will be created against the asset. To review a billing instruction, use the asset enquiry, Location History.
End of Month Billing for Hourly Plant Billing
If both Daily/Monthly Hire Billing instructions exist and Plant Time sheets have been posted for the same asset, the EOM process will reduce the value of the Hire Billing instruction by the value of the Plant Time sheets posted.