Skip to main content

Plan Data for Project Groups

Modified: 6 Nov 2026 Jobpac Connect Job Cost Help

Separate standalone Plan data can be entered for each Project Group.

A set of screens that is the same as the Workid Plan data entry is available from the Menu Option BFM Plan Maint-Groups. Data for each Project Group is entered separately.

Note: Plan Data for Groups does not add to Plan Data for a workid. They are entered separately.
Submit

Table of Contents