Managing the Forecast

Modified: 6 Nov 2026 Jobpac Connect Job Cost Help

Individual projects can start their forecast at any time outside the review period.

In order to maintain control over this forecast process, there is a ‘Super Lock’ facility, that can independently lock forecasts for selected or all projects. This can occur no matter what the Forecasting status of a project is. i.e. projects may have not started their forecast, or are part way through or have locked a forecast.

Only selected people have this ability, and this is determined by the screen displayed in the section above called “Maintain forecast Control’. If a user has a Y against their name then they can impose forecast locks on projects.

Once a lock is implemented on a project, then all forecasting is prevented. The forecast screens will be greyed out. The same rules apply as if the forecast is locked by the project manager. These are described later in the document.

To set those locks, the new menu option called ‘Forecasting Super Control’ is used.

???

Individual projects can be locked by using the right mouse button option, Lock. Projects already locked can be unlocked by the same process.

???

The columns on the screen are described below

Field Name Description
Parent This is Y if the job is a parent. These projects cannot be locked unless all children projects are locked.
Parent Job This is the job number of the parent. This only displays if the project is a child of a parent job.
Job Sts Status of the project. Can be, A, C, F. Filters for this status are at the bottom of the screen.
Project Manager This is picked up from the Job Maintenance screen.
BFM Period This is for information only
Rec Period This is N if Job Cost period = BFM period, and Y if Job Cost Period not = to BFM period, i.e. in the review period.
Job lock This is the standard BFM Job lock.
Fcst Status

This is the status of a Forecast being done outside the review period.

N = Not Started

S = Started

L = Locked

Snapshot Type

C = Current data used to start the forecast

H = Last period data used to start the forecast.

Sup Fst Lock N = No Super lock on, Y = Super lock in place

The options in the Actions Button allow a user to Bulk Lock/Bulk Unlock multiple projects at the same time. Selecting this option will mark all projects currently filtered as Locked/Unlocked.

For a project to be locked by this method, the same rules apply as when a project manager locks the forecast. There must be no unallocated WIH or Cash Receipts or Payments. A message will be displayed if this situation exists.

Submit