The BFM Non-project Level definition is the highest level of summarisation of Non-project information.
The BFM Non-project Level definition is the highest level of summarisation of Non-project information. Two examples of this are:
- Overhead Costs
- Sundry Income and Expenses
- Plant Operations
- Stock Operations
OR
- Head Office
- NSW
- VIC
- QLD
These are only a representation of two options available to configure the Level element within this hierarchy, a number of companies using the BFM module have successfully defined levels to represent geographical and discipline based summary data. The key point is the definition and control is totally user based and configurable within any Jobpac Work ID based on each organisation’s specific reporting and control requirements.