This control setting defines the authority level available for a user to affect cost transfer within the Contract Valuation maintenance program.
The available options are:
‘0’ – Basic -Cost transfers can be effected within a job
‘1’ - Job to Job - Cost transfers can be affected between projects that the user has access to.
‘2’ – Job to G/L-Cost transfers can be affected between jobs and from/to General Ledger accounts.
Blank --No access to the Cost Transfer facility