When a project is created within Jobpac to management income and/or cost contingencies, a special Contingency project type can be linked to the project to provide flexibility in managing Work in Hand distributions and margin effects during the Contract Valuation process.
The JTD Margin for Contingency job is again calculated as the difference between JTD Turnover (assumed to be manual Under / Over claim and WIP entries) and Cost of Work in Progress (CWIP – assumed to be manual cost accruals / adjustments).
Original Contract values and variation and scope changes are included in Order Intake Analysis