Modified: 6 Nov 2026 Jobpac Connect Job Cost Help

The option exists within the SOR module to establish Parent Schedule Items, which are made up of the sum of a number of Schedule Items, called child items.

Description

Parent Schedule Items are those usually presented to the client on Progress Claims, and in the original schedule. Using Child items allows more detailed management of budgets, earned values and forecasts on a monthly basis.

Parent Items can be established either manually, or created via an upload from Expert Estimation.

Manual Creation

A Parent code is first established. This code is the link between the Parent and the Child items. This will automatically create the Parent Item in the Schedule. The Parent Item has a quantity and a unit of measure, but no rate or Pay amount. The pay amount is derived from the sum of the pay amounts from the Child items. The rate is calculated by dividing the sum of the child pay amounts by the Parent quantity.

Automatic creation from Expert Estimation Template

Parent and Child Schedule Items can exist within the estimate produced by Expert Estimation. These are loaded into Jobpac via the upload process. The value held as the Parent Pay amount becomes the Schedule Item schedule amount, and the child items are loaded as they appear in the estimate. If any rounding difference between the sum of the children pay amounts, and the parent pay amount occurs, then a rounding item is automatically created for that difference. These rounding items have a sequence number in the protected range (>990,000), and are given an Item Type of RI. This enables filtering to see these items. In Item maintenance and Progress claim entry, these rounding items, and child pay amounts are, by default, not displayed. On option exists to display in both these function to display the child items. More information is provided in the description of these functions.

To set-up or maintain a Parent Code and Item from the Jobpac main menu, select Projects > Job Setup and Reports > Schedule of Rates > SOR Job Setup > Parent Item Maintenance.

A list of existing Parent Items is displayed. This is in expanded description mode. Each Parent item within the project is uniquely defined by the two character code in the first column.

???

On this screen you can update the details of the parent code by editing the fields and click OK to update your changes.

To add a new parent code click Add New Code on the Actions menu, then enter the following across the screen:

Field

Description

Code

Enter a 2 character code which is used to link the Parent Item and child items (Mandatory). This uniquely defines the parent Item.

Section

Enter section code required(optional)

Item

Enter the Parent Item No required. (Optional, may be blank). This will appear on the Progress Claim.

Description

Enter the description of the Parent Item No.

Quantity

Enter the quantity of the Parent Item

UOM

Enter the Unit of Measure for this item.

Inset after Seq No.

Controls the insertion point into the Item schedule for the Parent Item. Use whatever sequence number you want.

Rate

This field is a system calculated from the child items and not available for input.

Amount

This field is a system calculated from the child items and not available for input.

To delete an existing parent code, select Delete from the right mouse click menu. They can only be deleted if they are not linked to child items