If the schedule of rates is broken into defined sections, then these sections can be setup.
Once setup, every item in the schedule may be associated with a section.
There are three sections that have a specific meaning
- Section to contain all overhead items that source their budget from a component of the Schedule Item schedule.
- Section to contain all variation overhead items that source their budget from a component of the variation Schedule Item schedule
- Section to contain all variation Schedule Items
These will be explained in the setup of the SOR parameter for the project.
Select .
When the Setup Schedule Sections is selected from the menu a job selection screen is displayed. Selecting the job displays the following screen.
The three Sections above should be set for all projects, and then others added to break up the Schedule. They are used in the Progress Claim.
Enter each section code and description directly into the table format. Use the option Add New Code to position cursor for the new entry of a Section. If a section needs to be deleted, select the Delete option from the right mouse click options.
If a longer description is required, select the Text option from the right mouse click options. The Expand/Contract option can be used to display the full description of all sections.
The fields at the top of the table are for filtering entries already in the table.