This update also embeds an update of Quadri for Windows.
Release date: 18.02.2026
Visit our pages regarding Compatibility Breaks and Known Issues for Novapoint for more info on those topics.
QUADRI FOR WINDOWS
For Quadri, see the Release Notes in Quadri help.
QUADRI EXPORTS TO LandXML
Inframodel 3 and 4
CHANGED/FIXED: A change in the alignment exports with regard to CircCurve in the vertical geometry for Inframodel exports. The radius in vertical geometry for CircCurve now get both positive (sag curve) and negative (summit curve) in the file.
NOVAPOINT ROAD & RAILWAY
-
ENHANCEMENT: Upgrade of tasks via the Corridor Upgrade tool is improved to better support road and railway models that has not been edited since before the Novapoint 19.30 version.
-
FIXED: Cases of calculation stopping in some combinations when inner slope or insert edge on the right hand side ended above the road surface.
-
FIXED: Manhole bottom thickness value not set/updated in design after editing input value in Configuration database
-
FIXED: Crash using Update long section function after editing WS model
-
FIXED: Draw plan drawings of two WS task with the same filename of the MainProjectFile in the same DWG, the entities from the first WS task was deleted when the plan drawing for the second WS task i drawn.
-
FIXED: Wrong rectangular struct direction in WS InfraModel export