Quantm Desktop software uses a series of cost models to estimate the overall construction costs for a generated alignment.
The accuracy of these costs may be dictated by which stage in the planning process you are investigating. The principal tasks in planning, designing, and building a road or railway fall into a number of categories:
Preparatory tasks
- Acquire and clear land
Earthworks
- Excavate cuts
- Haul usable (excavated) material to fill sites
- Place and compact material in fills
- Haul unusable and surplus material to dump sites
- Haul additional material from borrow pits to make up for shortfalls
Supplementary works
- Lay materials for sub-base
- Lay pavement for roads or ballast for rail
Structures
- Construct retaining walls
- Construct bridges
- Construct culverts on minor water courses
- Construct tunnels
Additional tasks
- Paint road markings
- Install roadside posts to delimit shoulders
- Lay sleepers and rails for railways
- If necessary stabilize or landscape embankments in cut or on fill
Fixed costs
- Consultants fees
- Traffic signals, Interchanges
All of these tasks have a direct impact on costs, and with the exception of fixed costs, are affected by the alignment location during optimization. Some of these tasks and their associated costs will apply to the whole project and others will vary with the geographical area.