Generate alignment reports to view detailed data for specific alignments in your project.
- While viewing a single alignment, click Alignment Report from the Report tab. When the Alignment Report dialog is open, you can change the alignment you want to generate a report for by selecting another alignment.
- Enter the start point (From) and finish point (To). By default, these are the end points of the alignment, and the reporting interval (Interval). The reporting interval options are dependent on the resolution of the underlying terrain model. The minimum reporting interval that can be defined will be 20 m or 50 ft.
-
Select the report type to generate. There are three types of reports:
-
Customized
-
Cross section
-
Summary
-
- If your project system units are metric, you can view reports in imperial units by selecting the Convert to imperial units checkbox. If your project system units are imperial, you can view reports in metric units by selecting the Convert to metric units checkbox.
- Click OK. Select where to save the alignment report.
See: