View alignment summary

Modified: 22 Oct 2026 Quantm Help

View a summary of the construction quantities and costs for the selected alignment.

The Alignment Summary window gives the alignment name and total cost at the top, then a detailed breakdown of construction parameters and costs that contribute to the overall cost. Generally, the window has quantities and costs divided into five main categories:

  • Source: any geological materials that can be used for construction including cut, tunnel debris, import or borrow material.

  • Destination: any geological materials which must be used or removed from the site including fill, export, and dump materials.

  • Alignment : includes mass haul and pavement costs.

  • Structures: includes bridges, tunnels, retaining walls, and culverts

  • Additional Costs: includes area or linear costs and additional fixed costs if included.

You can view more information about some of the items by clicking a blue hyperlink.

  1. On the Report tab, click Alignment Summary.

    The Alignment Summary dialog appears.

  2. To report the costs and quantities with higher accuracy, change the significant figures in Preference settings.
  3. To view the type, start, finish, and severity of any warnings, at the bottom of the dialog, click the blue link for Warnings.
  4. You can also view the following in this dialog:
    • To view a full report that shows the volumes of cut used when constructing the alignment, and where cut was extracted along with its type, click Source.

    • To view the volume of material that was used as fill or removed from the site, click Destination.

    • To view the start, finish, and type of wall, the side of the alignment, length, area of wall, and cost, click Ret. Wall.

    • To view the start, finish, and type of culvert, the number of the alignment, the total length of channel required, and the cost (including portals), click Culvert.

    • To view the start, finish, and type of bridge, the length, area of decking, and cost, click Bridge.

    • To view the start, finish, and type of tunnel, the length, and cost (including portals), click Tunnel.

    • To view the area, and cost of each type of Area cost zone encountered, click Footprint Area.

    • To view the start, finish, length, and cost of each encounter with a Linear cost zone, click Linear.

    • To view a summary of the fixed costs, select Fixed Cost.
See also Variations.