Establish vertical transitions and manual fittings within a waste water system to connect multi-story sewerage installations.
While Stabicad automates many standard plumbing connections, complex multi-story waste water designs often require specific vertical transitions and manual component placement. By utilizing specialized tees, couplings, and stack connections, you can precisely link floor-level systems to main standpipes and maintain technical accuracy across different elevations.
Start a waste water system with a T-section
When drawing systems across multiple floors, floors are typically connected via a vertical standpipe. You link the floor-level system to this standpipe using a T-section as the primary connection point.
Once the T-section is placed, you can continue drawing the rest of the waste water system for that floor starting from the new connection point.
Place a connector manually
While Stabicad typically inserts connections automatically between pipes or ducts of the same diameter, you can use the manual placement function to select specific fittings or adjust rotations manually.
After the connector is placed, you can continue drawing the system from the new fitting.
Insert a standpipe connection
Waste water systems on different floors are typically joined by a vertical standpipe. By placing a stack connection, you establish the vertical rise or drop necessary to continue the system on a different level.
Once the vertical stack is in place, you can proceed with drawing the horizontal system for the corresponding floor.