Audit your electrical design layout for logical connectivity, panel distribution loads, and circuit tracking parameters.
By using real-time validation checks and network monitors, you can identify logical circuit inconsistencies and track load assignments across panels before generating electrical schematics.
Audit systems with the Installation Monitor (AutoCAD only)
Before you start, ensure your drawings contain modeled electrical symbols that are linked to a target distribution panel.
Open the dynamic monitor layout to control your electrical distribution networks and obtain a live operational overview of elements linked to each panel and group.
Verify and change panel and circuit assignments (CAD platforms only)
Verify if symbols in your technical drawing are correctly allocated to a panel and circuit layout, and change these structural assignments for power consumers.
Change and renumber circuits
Change, increase, decrease, or exchange circuit and subcircuit tracking numbers for symbols sharing a common electrical circuit loop.
Convert electrical symbols to newer AutoCAD version
Update the underlying data blocks of existing layout symbols in a drawing to a newer AutoCAD platform configuration to prevent software conflicts and asset property discrepancies.
- Open the appropriate Electrical palette and navigate to the Tools tab.
- Click Convert Electrical symbols to newer AutoCAD version.
- Select the symbols or selection scope across the active drawing view to execute the background translation utility.