Creep during construction stages can be allowed for on a simplified basis by using the US code approach described in ACI-318-11 clause 9.5.2.5.
Adopting this approach, Tekla Structural Designer uses the following table to make an automatic age based adjustment to the E & G values applied to concrete element properties.
| AGE | Beams and Slabs | Columns and Walls |
|---|---|---|
| 0 | 1.00 | 1.00 |
| 4.33 w | 0.62 | 0.79 |
| 13 w | 0.51 | 0.65 |
| 26 w | 0.46 | 0.60 |
| 52 w | 0.41 | 0.56 |
| 156 w | 0.36 | 0.55 |
| 260 w (or greater) | 0.34 | 0.55 |
The adjustment calculated for each member in each stage is as follows:
-
Determine the AGE of the member at the end of the stage currently under consideration:
-
ST_end = Stage Time for analysis model stage
-
ST_start = Stage time for the stage before the element was introduced
-
AGE = ST_end - ST_start
-
-
Calculate the additional creep adjustment factor by interpolation between the relevant values in the above table.
-
Adjust the E and G values.
For a construction stage 3 analysis model with total construction stage time = 12w, determine the adjustment for the cracked concrete beam introduced in stage 2 shown below.

As shown in the Construction Stages modification factors table, the beam’s unadjusted E and G modification factors = 1.00

To calculate the age based adjustment for this beam:
-
Determine the AGE of the beam at the end of stage 2:

-
ST_end = Stage Time for analysis model stage = 8w
-
ST_start = Stage time for the stage before the element was introduced = 4w
-
AGE = ST_end - ST_start = 4w
-
-
Calculate the additional creep adjustment factor at this age by interpolation between the relevant values in the table.
-
Adjustment factor for a beam at 4w = 0.649
-
-
Adjust the E value:
-
The beam’s original E modification factor = 1.0
-
The total adjustment applied to E = 0.649 * 1.0
-
-
Adjust the G value:
-
The beam’s original G modification factor = 1.0
-
The total adjustment applied to G = 0.649 * 1.0
-
To verify the total adjustment applied:
- Open a Structural View containing the element
- Select the element and confirm the concrete class in the Properties window.

- The unadjusted E and G values for this class are 33500 and 13958 respectively, as can be
confirmed in the Materials database.

- Switch the view regime to a Solver View
- On the Solver ribbon, set the Method to First-order linear staged construction
- On the Solver ribbon, select the required Construction Stage
- Select the element In the Solver View

- In the Material properties section of the Properties window, view the adjusted E and G values (21740 and 9058 respectively).

- The ratio of the adjusted to the unadjusted values should match the
calculated creep adjustment factor.
21740/ 33500 = 0.649 , 9058/13958 = 0.649
- Note that as shown below, if you were to select the next stage (St. 3) in the Solver
ribbon the beam's properties would change to reflect it's age (8 weeks) at
the end of stage 3. The adjusted E and G values now being 19210 and 8004
respectively.

The ratio of the adjusted to the unadjusted values equates to the new creep adjustment factor.
19210/ 33500 = 0.573 , 8004/13958 = 0.573
0.573 being the adjustment obtained by interpolating for an age of 8 weeks in the table.