Add / edit lead time and notes for quotes received

Modified: 14 Oct 2026 Trimble Materials Help

Specify lead times and add notes to any quotes received on an RFQ.

  1. On the left panel, select Orders.
  2. On the Open Activities page, select RFQs.
  3. To help you locate the RFQ you want to open, use the Search and / or Filter options.
  4. Select the RFQ you want to open.
  5. In the RFQ Summary dialog, in the column that has the quote you want to add or edit lead time and notes for:
    • If no lead time has yet been specified, in the left side of the column hover over the required line item then select +LEAD TIME.
    • If a lead time has already been specified, a tag shows the number of days; select it to edit the lead time and / or notes.
  6. In the Lead Time and Notes dialog, add or edit the lead time (in days) and any notes as required.
  7. Optionally, select Apply lead time to all items.
  8. Select X to close the dialog.