All contract schedules of values (SOVs) are set to a line type of either Lump Sum or Unit Based. You can change the line type to prompt Trimble Pay to recalculate the line items.
The contract must not yet be locked in order to take these steps. Contracts become locked in Trimble Pay when the subcontractor submits the contract's first bill.
- Recalculates your SOV line item values to convert them to the other type.
- Stops trying to detect the contract's line item type based on information from your integrated ERP.