Once you've imported a project into Trimble Pay, the SL subcontract change orders flow into Trimble Pay automatically.
- The project and the subcontract the change order pertains to already exist in Trimble Pay. For more information, see Import Projects from Vista and Import Subcontracts from Vista.
- The change order's Status in Vista is Interfaced.
Automated Sync
When you performed the one-time import of the Vista job into Trimble Pay, a job-specific connection was established.
From then on, the integration has run on a 30-minute schedule, continuously checking Vista for updates related to the job. Once an subcontract change order reaches the Interfaced status in Vista, Trimble Pay automatically links it to the subcontract.
- In the Contract tab, updates the Current contract value to reflect the change order amount.
- In the Change orders tab, displays a record of the change order, along with any other change orders for the same contract.
- Creates a new accounting line which is linked back to the proper subcontract line item in Vista.Note: The link from the new accounting line is based on which action in Vista triggered the change order:
- an update to an existing line item
- the creation of a new line item
- Adds a new line item to the subcontractor's Schedule of Values in Trimble Pay and links it to the proper line item in your Vista application. The subcontractor can now bill for the change order line in Trimble Pay.
About the Connection
- Every Phase Detail line in Vista has a unique combination of Phase, Ct, and Billing Item, which Trimble Pay uses to accurately establish and maintain the link.
- Each time Trimble Pay pulls in an executed change order, it creates a new accounting line. This may result in more accounting lines existing in Trimble Pay than Vista, but Trimble Pay rolls these costs together based on Vista's unique combination of Phase, Ct, and Billing Item.
- In Vista, change order amounts don't show up against the subcontract phase detail line until the subcontract change order status is Executed (E).
Change Order Management
For integrated contracts, manage all change orders directly within Vista. If an unbilled change order remains in Trimble Pay after being removed from Vista, delete it manually using these steps:
On the Trimble Pay contract page, select the Change orders tab.
- Choose the change order you want to delete from the list by selecting the caret.
If the change order has not been billed against, a Delete button displays.
- Select Delete.
- To confirm you want to delete the change order, select Yes.