Skip to main content

Collapse all expanded assemblies in the estimate

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. Open a job in the Manage Estimates screen.
  2. From the Estimate tab, right click in the left-most column then select Collapse All Assemblies. The cost items and assemblies that make up the assemblies are hidden so that only the assemblies on the same level as individual cost items are displayed.
Submit

Table of Contents