Field |
Description |
|---|---|
Matching Criteria |
Click
|
Estimate |
Select the checkbox to find items in the estimate. This checkbox does not appear when you open financial cost items in the Catalog tab. |
Alternate |
Select the checkbox to find items in alternates. This checkbox does not appear when you open financial cost items in the Catalog tab. |
Change Ord. |
Select the checkbox to find items in change orders. This checkbox does not appear when you open financial cost items in the Catalog tab. |
Selected Query |
Click |
Criteria Rows – Each row is a criteria. You must enter at least one row or use a Selected Query. |
|
Field |
Click The field column specifies which field (column) you want to search. For example, if you are searching for cost items that have the word Concrete in the Description, you would select Description in the Field column. |
Select By |
Click The column you select in the Field column determines what options are available in the Select By column. The option you select could be a mathematical operator, such as = (equal) or > (greater than), or it could be something like Starts with or Contains. The mathematical operators are used for columns that contain only numbers. If you select Type in the Field column, the Select By column also contains the Value and you should not enter a separate Value. For example, you can select "Is Equipment" to look for equipment type cost items. |
Value |
Enter the value you want to find. The Value column enables you to specify what information to search for based on the Field and Select By options you selected. For example, if you select to search the Quantity column for cost items that are equal to 0 (zero), you would select Quantity in the Field column, = in the Select By column, and 0 in the Value column. Note that some Fields and Select By options you select do not require you to enter a Value. |
to select one of the following match criteria from the drop-down: