From the Detail tab, click
Insert
.
-
Use one of the following methods to insert cost items from the catalog:
Select the checkbox
for each cost item to include.Click Find Cost Items to search for the cost items to include.
Select a folder and click Add to Catalog to add a new cost item to the catalog.
- Select the Insert as bid item(s) checkbox if you want to insert the selected cost items into the change order as bid items. Deselect this checkbox to insert the cost items as cost items.
- Click OK.