Modify a Cost Item from the Change Order Panel Tab in the Takeoff Tab

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. Open a job in the Manage Estimates screen.
  2. From the Takeoff tab, open the Change Order panel tab.
  3. Expand the change order that contains the cost item you want to modify.
  4. Select the cost item you want to modify.
  5. Click Takeoff Item and select Edit Item.
  6. Modify the fields on the Cost Item window for the type of cost item you are modifying:
    • Cost Item (Basic)
    • List Assembly
    • Quick Assembly
    • Visual Assembly
    • Bid Items
  7. Click OK.