Enter WBS code values as sort criteria for change orders

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. Open a job in the Manage Estimates screen.
  2. On the Change Orders tab, select a change order you want to include in the sort.
  3. Click Edit on the speedbar.
  4. On the Summary tab in the Sort1 field, click to select the WBS code value for the primary sort for this change order from a list. The WBS code is displayed to the right of the field. If Sort1 is displayed to the right, no WBS code has been selected for the sort.
  5. On the Summary tab in the Sort2 field, click to select the WBS code value for the secondary sort for this change order from a list. The WBS code is displayed to the right of the field. If Sort2 is displayed to the right, no WBS code has been selected for the sort.
  6. On the Summary tab in the Sort3 field, click to select the WBS code value for the tertiary sort for this change order from a list. The WBS code is displayed to the right of the field. If Sort3 is displayed to the right, no WBS code has been selected for the sort.
  7. Click OK.
  8. Repeat steps 2 - 7 for every change order you want to include in the sort.
    Note: You can set the WBS code value for a change order directly in the Change Orders tab by clicking in the sort field and selecting the WBS code value from the list.