Set up sorts on WBS codes

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. Open a job in the Manage Estimates screen.
  2. On the Change Orders tab, click Sort on the speedbar.
  3. In the Level 1 field, click to select the WBS code to use as the primary sort field. The Sort1 field is renamed to the WBS code selected.
  4. In the Level 2 field, click to select the WBS code to use as the secondary sort field. The Sort2 field is renamed to the WBS code selected.
  5. In the Level 3 field, click to select the WBS code to use as the tertiary sort field. The Sort3 field is renamed to the WBS code selected.
  6. Click OK.