Skip to main content

Change the Column Width

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. Open a job in the Manage Estimates screen.
  2. Open the Catalog, Estimate, Alternate, Change Orders, or Summary tab.
  3. Move the cursor over the edge of the column header in the column you want to resize until the cursor changes to the cursor.
  4. Drag the cursor to the left or right until the cursor is the appropriate width.
Submit

Table of Contents