When you create a crew that is defined by man-hours, you create a list assembly cost item. Set the Units of the list assembly to some unit of time, such as hours, days, or weeks, and set the Quantity of the list assembly to 1 (one). Next, add labor cost items you want to include in the crew as members of the list assembly.
For example, assume three manual laborers are needed full time for each crew hour. In Case 1, you would add three laborer cost items to the assembly, each with a Quantity of 1. In Case 2, you would add one laborer cost item and assign it a Quantity of 3. In Case 3, you would create a new cost item, called Three Manual Laborers, set its unit cost to three times the rate of a single laborer, and assign it a Quantity of 1.
Next, you would enter the appropriate LaborHours. LaborHours is the number of people per crew hour. In Case 1 and Case 2, LaborHours should be set to 1. Each hour of the member represents one person. For Case 3, LaborHours should be set to 3 since there are three laborers for each hour estimated in the quantity.
See how each of the three cases look below for a crew called Truck Crew that consists of the following:
Half time of a foreman
Three manual laborers
One truck driver
One truck
Note that all three methods result in the same Extended Cost (XtdCost) and Man-Hours. However, Case 2 distorts the LaborHours which can distort estimates of task duration, and Case 3 requires a modification of UnitCost.
Case 1
|
Description |
Type |
Qty |
Units |
Unit Cost |
XtdCost |
Labor Hours |
Person Hours |
|---|---|---|---|---|---|---|---|
|
Truck Crew |
List |
1.00 |
HR |
63.25 |
63.25 |
5 |
4.5 |
|
Truck Driver |
Labor |
1.00 |
HR |
21.50 |
21.50 |
1 |
1.0 |
|
Foreman |
Labor |
0.50 |
HR |
23.50 |
11.75 |
1 |
0.5 |
|
Laborer |
Labor |
1.00 |
HR |
10.00 |
10.00 |
1 |
1.0 |
|
Laborer |
Labor |
1.00 |
HR |
10.00 |
10.00 |
1 |
1.0 |
|
Laborer |
Labor |
1.00 |
HR |
10.00 |
10.00 |
1 |
1.0 |
Case 2
|
Description |
Type |
Qty |
Units |
Unit Cost |
XtdCost |
Labor Hours |
Person Hours |
|---|---|---|---|---|---|---|---|
|
Truck Crew |
List |
1.00 |
HR |
63.25 |
63.25 |
3 |
4.5 |
|
Truck Driver |
Labor |
1.00 |
HR |
21.50 |
21.50 |
1 |
1.0 |
|
Foreman |
Labor |
0.50 |
HR |
23.50 |
11.75 |
1 |
0.5 |
|
Laborer |
Labor |
3.00 |
HR |
10.00 |
30.00 |
1 |
3.0 |
Case 3
|
Description |
Type |
Qty |
Units |
Unit Cost |
XtdCost |
Labor Hours |
Person Hours |
|---|---|---|---|---|---|---|---|
|
Truck Crew |
List |
1.00 |
HR |
63.25 |
63.25 |
5 |
4.5 |
|
Truck Driver |
Labor |
1.00 |
HR |
21.50 |
21.50 |
1 |
1.0 |
|
Foreman |
Labor |
0.50 |
HR |
23.50 |
11.75 |
1 |
0.5 |
|
Laborer (3) |
Labor |
1.00 |
HR |
30.00 |
30.00 |
3 |
3.0 |