- Open a job in the Manage Estimates screen.
-
From either the Estimate tab or the Catalog tab, do one of the following:
Add a new labor cost item. See Basic Cost Items for details.
Select an existing labor cost item and click Edit
on the
speedbar.Note: You can also access the labor calculator from a labor cost item in an assembly.
-
In the Cost Item window,
click
next to the selected Cost Basis field.
- Click Modify Tables.
- Select the fringe table to delete from the list and click Delete.
- Click OK.
- Click Done.
- Click OK.
- Click OK.