Skip to main content

Edit a cost item within a change order

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. From the Details tab, double-click the item you want to edit.
  2. Fill in the fields on the Cost Item window for the type of cost item you are adding:
    • Cost Item (Basic)
    • List Assembly
    • Quick Assembly
    • Visual Assembly
    • Enterprise Level Assembly
    • Bid Items
    • Financial Cost Item
  3. Click OK.
Submit

Table of Contents