- Open a job in the Manage Earthwork Estimates screen.
- Select the Takeoff tab, if it is not already active.
-
Click Multi
on the speedbar.
- Select the lines you want to join.
- Click in the All Tasks pane. The lines are joined using a straight line between the closest two points.
Tip: A progress bar appears when
the application is joining lines. If the process takes too long, click Cancel to stop the join.