You must set the drawing scale and location before you digitize reference points.
Open a job in the Manage Earthwork Estimates screen.
-
Select the Takeoff tab, if it is not already active.
-
Set the drawing scale and location if they are not already set for the drawing for which you want to digitize reference points.
-
Click in the All Tasks pane.
-
Press the tip of the digitizer on the first reference point you want to digitize on the drawing.
Note: If you are going to use this with matchlines, this point
must also appear on another drawing you want to include in the job.
-
In the Name of reference point field, enter a unique name for the reference point.
-
Click OK.
-
Click OK.