Join multiple pixel-based lines

Modified: 7 Sep 2026 Viewpoint Estimating Estimating Help
  1. Open a job in the Manage Earthwork Estimates screen.
  2. Select the Takeoff tab, if it is not already active.
  3. Click Estimating > Earthwork > Takeoff > Multiple Join in the All Tasks pane.
  4. In the Join Distance field, enter the maximum distance in feet or meters that can separate the lines to be joined.
    Tip: You don’t have to click in the field before you start typing a value.
  5. Select the Only join matching elevations checkbox to only join lines with the same elevation. Deselect the checkbox to join lines of different elevations.
  6. Click OK.
  7. If you need to undo the join, press Ctrl + [Z].