- Open a job in the Manage Earthwork Estimates screen.
- Select the Takeoff tab, if it is not already active.
- Click Estimating > Earthwork > Takeoff > Multiple Join in the All Tasks pane.
-
In the Join Distance field, enter the maximum distance in feet or meters that can separate the lines to be joined.
Tip: You don’t have to click in the field before you start typing a value.
- Select the Only join matching elevations checkbox to only join lines with the same elevation. Deselect the checkbox to join lines of different elevations.
- Click OK.
- If you need to undo the join, press Ctrl + [Z].