You can set up the internal coordinates for the project so that models can be checked
for compliance (for example, to ensure that a building is positioned correctly on a
site).
-
In the navigation tree, select a BIM container to display the BIM Home
page.
-
Click Configure Project Protocols
and select the Model Protocols
tab.
-
Next to Project Coordinates, click
Edit.
-
Under Project Coordinates, enter coordinates as
appropriate in each field.
You can type the coordinates or use the spinner control (

) to enter
the coordinates.
-
Click Save.