Once a project editor has assigned you a daily log, you can
open the daily log from the Viewpoint Team™ home page,
project dashboard, or Daily Logs page for your project and fill out
the required fields.
A project editor must first
configure Daily Logs for a project, and then assign you a log before you can post
one.
-
From the home page, under Assigned to
Me, click the daily log assigned to you.
The Daily Log page for that day
appears.
-
Click the Edit button to enable editing
in all the log categories. To add an entry in a single category of the log,
click the plus sign
next to the category
heading.
-
Enter information in each Daily Log field as
needed. For details on each field, see Daily Log Fields.
For each category, you can add an attachment. Either click
the attachment icon, or drag and drop the attachment to a field in the
log.
-
When you have finished with your log entry, click
Save. Once a log
entry is saved, you can navigate to a different page and then return to the log
to continue where you left off.
-
(Optional) If no work was done on the day of the assigned Daily Log, you can
indicate "No Work Done" for that log.
-
From the upper right-hand corner, click
,
and select No Work Done.
-
Click Save. Continue to the last step to submit
the log.
-
(Optional) If you wish to copy the work or
equipment details from a previous log, you can do so.
-
From the upper right-hand corner, click
, and select Copy Previous
Log to open the Copy Previous Log
dialog.
-
In the Date
section, select the date of the log you wish to copy.
-
From the Logs
drop-down menu, select the log you want to copy.
-
Select the check boxes for the fields you
want to copy, and then click Copy. The selected
fields will be copied into your current log.
-
Click Copy .
-
When you have filled out all the required fields,
click the Post button
in the upper right-hand corner of the page to post the daily log.
Note: Once a daily log is posted, in order to edit it again,
the assigned project member must reopen it. See
Reopen a Daily Log.