PCO Fields

Modified: 10 May 2026 Viewpoint Team Change Management Help

The Potential Change Order (PCO) details page contains editable fields to include additional items to adjust your Costs, Markups, and Add-ons. Adding items automatically updates the total cost of your change order.

PCO Detail

Note: Some PCO fields may vary depending on whether you use Vista or Spectrum.

Also note that, for some fields, values you enter in Team may be overwritten once the PCO is transferred to your ERP.

Field Description
Title The name of your PCO.

Note that, for connected Spectrum users, this field is overwritten by a Spectrum-generated value once the PCO is transferred to Spectrum.

Origination Date The date of creation.
Contract (Required for Spectrum) Select a contract from the drop-down menu.
Type (Vista only) The types that are used to sort your data. Example: PCO, OCO, etc.
Description Brief description/explanation on the change order.
Priority (Required) Set the priority to High,Medium, or Low.

Note that, for connected Spectrum users, this field is not saved.

ROM The Rough Order of Magnitude.
Status (Required) Where the PCO currently is in the process. Example: FA - For Approval

For connected Spectrum users, select a status from the drop-down menu.

PCO Item

Note: You can add a description in the field to the right of of the item number.

For Spectrum users, there is a 30 character limit for this field. If this field is left blank, when the PCO is transferred to Spectrum, it will default to the description from the Spectrum schedule of values.

Field Description
Contract Billing Item Where the item will display on the bill or schedule of values. Example: 1 - Pre Construction
Schedule Impact How many days will be added to the original schedule.
Quantity The total record number.
UM Your unit of measure. Example: LS - Lump Sum
Unit Price The price per unit.
Fixed Amount The set fixed amount of the PCO item.
Status Where the PCO currently is in the process. Example: FA - For Approval

Costs

Field Description
Phase What the Phase/Activity/Cost code for the budget line. Example: 02500- - - Paving
Cost Type The type of item. Example: Rented Equipment, Labor, or Materials.
UM The unit of measurement for the cost type.
Quantity The total amount of the cost type.
Hours The hours applicable for the cost type.
Cost/Unit ($) The cost per unit in dollar amounts.
Cost/Hour ($) The cost per unit in hours.
Hours/Unit The set hours per unit.
Estimate ($) The estimated cost of the cost type.
Note: This is automatically generated after entering your cost information.
SL/PO For Vista, add a Subcontract or Purchase order to applicable items.

For Spectrum, add a Subcontract.

Markup

Field Description
Cost Type The type of item for the markup. Example: Rented Equipment, Labor, or Materials.
Net Amount The gross amount of the markup.
Contract Markup (%) The markup percentage.
Contract Markup Amount ($) The total markup amount.

Add-Ons

Field Description
Add-On Code The Codes for your add-on. Example: A63433 - A68582
Calculation Method The method for calculating the add-on. Example: A- Fixed Amount
Basis The basis of the add-on. For example: C - Cost
Basis Cost Type The cost type on which to calculate the add-on amount.
Phase What the Phase/Activity/Cost code for the budget line. Example: 02500- - - Paving
Cost Type The type of item for the add-on.
Net Amount The gross amount of the add-on.
Add-On Percent (%) The percent of the add-on.
Add-On Amount ($) Total amount of the add-on in dollar format.

In the Attachments section you can upload an attachment. However, note that attachments are not transferred to your ERP.